2014/09/26

Solar panel installation (Part 2)

I created a short video summarizing the construction process from ground works to installing the panels.

It's very short video - less than 2 minutes - but worth watching!

パネル取り付け(その2)

English link

基礎工事からパネルの取り付けが終わったところまで全工程をまとめた動画を作りました。

2分以内で終わるとっても短い動画ですが、見る価値があると思います!

 

2014/09/20

Solar panel installation (Part 1)

(Japanese article is here.)
Frame construction is finished and the installation of panels has begun.
Solar panels in the cardboard box are waiting for their turn:

Dsc00550re

First, take three panels, put them on this working table and attach them to a pipe:

Dsc00547re

Dsc00565re

Next,  lift the pipe up onto the frame and attach it there.

This was a bit of a memorable moment in the history of Oo solar sharing plant: The very first panels were mounted on the frame:  

Dsc00560re

At this time, our architect Matsuoka-san was there too (in the lower left corner of the picture above, wearing white helmet.)
Finally our place started to resemble a solar sharing project!
The first row of panels was completed the day after the panel installation started.

Dsc00588re

A few days later, including weekend break, there were three rows done:

Dsc00590re

And they turn around! Here's Matsuoka-san checking the tilting mechanism:

Dsc00592re

Yesterday, Sept. 19, most panels were already installed:

Dsc00602re

Dsc00603re

To be continued tomorrow...

パネル取り付け(その1)

(英語の記事はこちら。)

架台の工事が終わり、パネルの取り付けが始まりました。

ダンボールの中で自分の出番を待っているパネルたち:

Dsc00550re

まずはこの作業台でパネルを3枚並べて、単管パイプに取り付けます。

Dsc00547re

Dsc00565re

パネルのついた単管パイプを架台の上に持ち上げて、架台に取り付けます。

おお発電所の歴史でちょっとした記念すべき瞬間:最初のパネルが架台の上に上がりました: 

Dsc00560re

この時は、設計をしてくださっている松岡さんも来ていました(↑写真の左下で白いヘルメットをかぶっています。)
これでやっとソーラーシェアリングらしい格好に近づきました。
パネル取り付け開始日の次の日に、一列目のパネルが全部つきました:

Dsc00588re

週末をはさんで数日後は3列目まで完成:

Dsc00590re

しかも回っています!松岡さんが回転システムを確認しているところ:

Dsc00592re

昨日9/19にはもうパネルの大半がついていました:

Dsc00602re

Dsc00603re

続きはまた明日にします。

2014/09/02

Construction continues: beams and braces

(Japanese article is here.)

The construction has quite progressed last week.

All pillars now stand in their place. The next stage is attaching horizontal pipes to the pillars 3 meters above the ground. The horizontal pipes are (probably) called beams. With no engineering background, I'm increasingly grappling to find the right vocabulary. If you notice any big mistake in these articles, let me know! 

 

This is a picture from ground works. Workmen are setting up a pillar while measuring the exact position.

Dsc00430re

All pillars are now standing! Ground works completed:

Dsc00452re

 

If you look closer at the picture above, in the back you can see a few horizontal pipes attached to the pillars. The workmen had set them up experimentally as the last thing on that day. A closer view:

Dsc00450re

To make the frame strong and stable, it's important to connect pillars and beams with diagonal pipes called braces.

Dsc00506re

 

There are 3 to 4 braces per pillar, and each connecting point has to be attached with a clamp, so it might take some time to finish.
Workmen sitting on a stepladder, tightening a clamp.

Dsc00492re

 

Unlike the first week of construction, the second week was cloudy and with cooler temperatures, so the work was probably easier. On the other hand, rainy days might have been tougher than the hot but sunny days last week. Despite the rain workmen did a great job again.

This is the progress made so far:

Dsc00498re

A view from the opposite side:

Dsc00502re

For my fellow non-engineer non-native speakers who are as clueless about beams and braces as I am, here's how I understand it. I hope it's right:

20140902_bracebeampillar_fin_2

2014/09/01

基礎工事完了、梁+筋交いの取り付け開始

(英語の記事はこちら。)

先週一週間で工事がずいぶん進みました。

柱の基礎工事が終わり、3メートルの高さに横方向で単管パイプを取り付ける作業が始まりました。これを梁(はり)と言うそうです。建築用語がさっぱり分からない私にはとても読めない漢字です。

 

まだ基礎工事の時に、作業員の方が寸法を測りながら柱を建てている様子:

Dsc00430re

柱が全部建ちました!基礎工事完了:

Dsc00452re

 

上の写真の奥にも少し見えますが、この日の最後に、作業員の方が、横の単管パイプを試験的に1スパンだけ取り付けてみました(=梁)。近くから見ると:

Dsc00450re

丈夫な構造にするには、柱と梁を斜めの単管パイプでつなげる必要があります。これを筋交いと言うそうです:

Dsc00506re

 

柱一本当たり筋交い4本もあり、接続のところを一つ一つ、クランプで取り付けなければなりません。完成までは少し時間がかかりそうです。
脚立にのぼってクランプを締め付けている作業員の方:

Dsc00492re

 

工事1週目とは違って、2週目は天気がずっと曇りで気温も下がったので作業はだいぶやりやすくなったのでしょうが、雨の日は逆に大変だったかもしれません。作業員の方が雨にも負けず頑張ってくれました。

 

工事は現在ここまで進みました:

Dsc00498re

向こう側からのビュー:

Dsc00502re